WhatsAPP:+86 13937115575
E-mail:xbzg@xbzg.com

A case study of the 1000t/d ore mine in Africa

【Yield】:2 million tons/year

【Processing of materials】:Sand gold

【Material granularity】:0-10mm, 10-20mm, 20-40mm

【Discharge size】:5-10mm、10-20mm、20-30mm

【Equipment configuration】:JAW CRUSHERS、BALL MILL、MAGNETIC SEPARATORS

Please click on the button below, our engineers will be tailored for you to create a suitable solution for you

Online configuration plan

Or call:400—691 5855

Project Analysis

Development, to undertake heavy African Mali, sand gold, Chinese heavy industry with exquisite technology and advanced equipment, good service, high concentration index, all spoke highly of by the partners, for the development of heavy industry won a good reputation in the African market

 
 

Customer Feedback

After the design of the development, heavy industry, gold equipment from development, heavy industry, the main mineral processing index of the gold mine: a capacity of 2000 t/d, to concentrate taste of 1.32 g/t, tailings taste of 0.32 g/t, recovery rate reached 86.12%, recovery rate from 80.03% increase with 86.12% now, increased by 6.09%, all kinds of reagents consumption also reached the drastic decline. Xingbang heavy industry's consummate technology and advanced equipment, good service, high concentration index, won the high appraisal. It has strengthened the brand in Africa and the world, laying a solid foundation for the development of xingbang heavy industries.

Related Products