Feeding size: ≤20mm
Capacity: 1-615t/h
Materials: steel slag, white ash, gold ore, aluminum powder, quartz sand, hematite, high alumina porcelain, iron powder, fluorite ore, slime, potash feldspar, tungsten carbide, copper ore, slag, bauxite ,Wait.
Feeding size: none
Capacity: none
Materials: copper, zinc, lead, nickel, gold and other non-ferrous metals, ferrous metals, non-metallic and other materials.
Feeding size: 0.07-0.83mm
Capacity: 340-23400t/d
Materials: suitable for all kinds of ores with overflow particle size of 0.07mm ~ 0.83mm
Feeding size: 0-0.8mm
Capacity: 10-350t/h
Materials: magnetite, magnetic pyrite, roasted ore, ilmenite, coal, non-metallic ore and other materials with a particle size of less than 3mm.
Feeding size: 0-6mm
Capacity: 1-10t/h
Materials: pulverized coal, cement, clinker, limestone, shale, coal gangue, clay and other powder, granular or small materials
Feeding size: <3mm
Capacity: 15-108 t/d
Materials: Tin, tungsten, gold and silver, lead, zinc, tantalum, niobium, iron, manganese, ferrotitanium and coal etc.
Feeding size: 2-30mm
Capacity: 12-175m³/h
Materials: Used for classification and screening of medium and fine-grained materials such as stones, soil, coal, etc.
Feeding size: none
Capacity: 15-48 t/h
Materials: It is used for dry and wet screening, classification and dehydration of various materials in industries such as mineral processing, coal preparation, chemical industry, brick making, food, pharmacy, alkali making, fertilizer, paper making, etc.
500t/h copper ore beneficiation project in IndonesiaDue to the strong stirring force of the copper ore flotation machine, the ore particles with a relatively large particle size and density can be suspended, and a...
Russia 1000t/h copper ore beneficiation projectRussia is rich in copper resources. According to data from Russia's National Reserve Balance Sheet, as of 2015, Russia had copper reserves of 91.85 million tons ...
400t/h iron ore beneficiation project in AustraliaThe Australian customer opened an iron ore plant. As the company developed, the existing production capacity could not keep up with the company's new demand. So ...